International Business Daily, January 24, Page 6 (Excerpt): In 2012, the arrival of an order from the USA attracted the attentions of the world to steel bridge in China, and made it famous in the international market. Constructed in 1964, Verrazano-Narrows Bridge, the landmark between two large districts in New York, had been put into service for a long time. The reinforced concrete structure of the upper road could not bear the burden of heavy traffic. The New York Metropolitan Transportation Authority (MTA) that was responsible for the management decided to refit the bridge. The main tasks w...
发布时间:
2018
-
01
-
25
浏览次数:16
TBM construction site at Beicheng Tunnel on Menghua Railway、Front of the Horse-Shoe Shape EPB TBMPeoplerail.com (by Tang Kejun) On January 3, the world’s First Horse-Shoe Shape EPB TBM bored 3000m in the earth at Beicheng Tunnel on Menghua Railway, marking the successful application of tunnel boring method in a loess tunnel in China. It will be a model for the tunnel construction in Northwest China where there are most loess, soft and weak land. Horse-Shoe Shape EPB TBM was developed by China Railway Engineering Equipment Group, a sub company of China Railway Hi-Tech Industry Corporation ...
发布时间:
2018
-
01
-
04
浏览次数:23
On September 25, 2017, the first Service-Oriented Manufacturing Conference of China was held in Guangzhou. China Railway Engineering Equipment Group was listed as the first group of "Model Enterprises of Service-Oriented Manufacturing", and was granted the qualification. Service-oriented manufacturing is a new form of industry integrating manufacturing and services, and is the direction for manufacturing to transform and upgrade. Since the establishment, China Railway Engineering Equipment Group has been trying to achieve "Four Transformations", namely, transforming fr...
发布时间:
2017
-
10
-
01
浏览次数:22