A-share600528
SKAB:SEK 161.1 -1.2%

News

News

Good News from CRHIC's Key Projects

Time: 2022-12-13
Times of browsing: 3

The first round manufacturing of the main channel bridge steel tower and steel truss girder of Changtai Yangtze River Bridge passes acceptance

Recently, the first round manufacturing for the main structure main channel bridge steel tower and steel truss girder of Lot CT-A5 of Changtai Yangtze River Bridge (river-crossing section), the world's largest span cable-stayed bridge for both highway and railway, passed acceptance. With relentless technical research and development in the process of processing and manufacturing, the project team has worked out manufacturing accuracy control technology for ultra-long chord, accuracy control technology for orthotropic plate bridge deck block, and large segment manufacturing technology for steel truss girder on the same floor for highway and railway, greatly improving the processing accuracy and efficiency.


900t bridge erecting machine completes girder erection out of single-line tunnel entrance for the first time in China

Recently, during the construction of the Nanchang-Jingdezhen-Huangshan High-speed Railway in Jingdezhen, Jiangxi Province, the JQSD900 tunnel-crossing bridge erecting machine developed by China Railway Science and Industry Group Co., Ltd. under CRHIC successfully erected box girders 3 meters out of Daling single line tunnel entrance. It overcame the following difficulties: the single line tunnel is narrow, equipment space at the tunnel entrance is limited, and there is large ramp and small curve. This is the first time that the 900t bridge erecting machine successfully completed the girder erection task under such complex working conditions in China.

JQSD900 bridge erecting machine is a three-legged tunnel-crossing bridge erecting machine with single main beam. It passes through span by moving forward and driving the arms to the right place at one time via the front and rear legs, and completes girder erection by fixed-point lifting via the front and rear lifting trolleys, presenting high erecting efficiency. The machine features three advantages: it can walk through the subgrade automatically with the help of self-stabilizing structure and leg drive; it can pass through the double track tunnel smoothly and erect girder 3m out of the tunnel entrance; it attains a new level of automation with the new functions of one-key through-span and one-key girder erection, upgrading the intrinsic safety of the machine. Moreover, the machine also manages double-line box girder erection with a minimum curve radius of 600m and a longitudinal slope of 30‰, and meets the erection requirement of single-line box girder erection with simple modification.

Good News from CRHIC's Key Projects


Beijing-Xiong’an Expressway successfully completes its first steel box girder erection by incremental launching

Recently, the steel box girder of Changyang Interchange crossing Fangshan Metro Line and National Highway 107 of Beijing-Xiong’an Expressway (Beijing Section) Project, which was built with the participation of China Railway Jiujiang Bridge Engineering Co., Ltd. under CRHIC, was erected by incremental launching. The expressway is about 105 kilometers long, of which the Beijing section is about 27 kilometers. In the early stage, the steel box girder was pushed to the edge of Fangshan Line in the daytime by incremental launching, while the remaining incremental launching and girder falling construction happened at night after subway outage. The incremental launching method features simple equipment, stable construction and low noise without traffic interruption, thus it can minimize the impact on the traffic operation safety of subway and national highway.

Good News from CRHIC's Key Projects

Related news / 推荐新闻 More
2024 - 10 - 02
On October 1st, the highly anticipated Macao Bridge (formerly known as the Fourth Bridge Linking Macau and Taipa) inauguration ceremony was grandly held on the banks of the Haojiang River, marking the completion and operation of the fourth cross-sea bridge connecting Macau and Taipa, built with the participation of CRHIC. Macao Bridge is the first two-way eight-lane cross-sea bridge in Macau.The M...
2024 - 08 - 06
On August 5th, five “explosion-proof” earth pressure balance TBMs for export projects in Italy passed client’s acceptance and collectively rolled off the production line at the manufacturing base of China Railway Engineering Equipment Group Co., Ltd. (CREG). The machines will be shipped to Italy for the PA-CT Phase II project on Island of Sicily and the Salerno high-speed railway project, providin...
2024 - 08 - 03
From completing the first section of the main line 23 days ahead of schedule, to entering the third phase of construction 45 days in advance, the East Coast Railway Link of Malaysia, a key project under “the belt and Road Initiative” has seen continuous acceleration thanks to the application of the CCPG500A intelligent multi-scene track-laying unit “Penglai” custom-made by China Railway Science an...
About Us China Railway Hi-Tech Industry Co., Ltd. belongs to the world's 500 strong enterprises China Railway Group Limited
Contact us
Address:Building 11, Noble center, South Fourth Ring Road, Fengtai District, Beijing,China
E-mail:inter-biz@crhic.cn
Tel:010-52265888
Fax:010-52265888
Copyright © China Railway Hi-Tech Industry Corporation Limited . All Rights Reserved
犀牛云提供企业云服务