A-share600528
SKAB:SEK 161.1 -1.2%

News

News

600km/h High-speed Maglev Traffic System Rolls off the Production Line: CRHIC Manufactures its Turno

Time: 2021-07-20
Times of browsing: 2

On July 20, China's 600km/h high-speed maglev traffic system rolls off the production line in Qingdao, Shandong Province. China Railway Baoji Bridge Group Co., Ltd. (CRBG) affiliated to CRHIC undertakes its turnout design, manufacture, installation and debugging.

600km/h High-speed Maglev Traffic System Rolls off the Production Line: CRHIC Manufactures its Turno

The maglev turnout system manufactured by CRBG is a flexible right-hand turnout, with a length of 78.432m, width of nearly 2.8m, switch distance of 3.65m and straight passing speed of 600km / h. It is the world's highest passing speed maglev turnout. During the field debugging, the Project Team of CRBG continuously optimized the timing sequence of each driving point and the driving collaborative system of each dynamic point of the turnout to ensure the optimal state of the stress, alignment and driving force of the turnout beam, and the switch stability and smooth alignment, to the greatest extent. 

600km/h High-speed Maglev Traffic System Rolls off the Production Line: CRHIC Manufactures its Turno

The turnouts occupy the leading position in the industry in terms of main parameters. During its development, CRBG developed an intelligent control system to minimize the bending stress of beam in the switch process, and designed the eight span continuous flexible turnout with large stiffness to ensure high-speed maglev train may pass through. During its manufacture, CRBG applied precision group welding and integral machining technology to guarantee the precision of turnout beam, made proprietary tooling to allow overall flip of ultra-long, ultra-heavy, flexible turnout beam structure parts, adopted overall turnout static assembly technology to simulate the requirements of the line rail transit, bringing valuable experience for future construction of 600km/h high-speed maglev line. 


Related news / 推荐新闻 More
2024 - 06 - 30
On June 30, the Shenzhen-Zhongshan Link Project, which took 7 years to construct, had been officially completed and opened to traffic. Integrating “bridge, artificial island, tunnel and underwater interchange”, the 24.03km long Shenzhen-Zhongshan Link is the world’s largest cross-sea cluster project. China Railway Shanhaiguan Bridge Group Co., Ltd. and China Railway Baoji Bridge Group Co., Ltd. af...
2024 - 04 - 24
On April 23 Georgia time, “Caucasus”, the world’s largest diameter full face hard rock TBM jointly developed by CREG and CRTG, successfully broke through, marking the completion of the tunneling phase for the Kvesheti-Kobi Highway as part of the North-South Road Corridor in Georgia, achieving a 30-day advancement over the overall construction schedule.With a boring diameter of 15.08 meters, a tota...
2024 - 04 - 22
The opening ceremony of the 2024 World Tunnel Congress, jointly hosted by International Tunneling and Underground Space Association and China Civil Engineering Society, was held at Shenzhen World Exhibition & Convention Center on April 22, 2024. Over 3,000 experts, scholars, and business representatives from member countries of the International Tunneling and Underground Space Association conv...
2024 - 04 - 03
On April 3, 2024, amidst the cheers at the construction site of the Algiers Metro Line 1 Extension Line Project in Algeria, Africa, the earth pressure balance TBM manufactured by China Railway Engineering Equipment Group Co., Ltd. under CRHIC broke through the wall, marking the full completion of the Subway Line 1 Extension Line Project. The TBM is the first of its kind exported to Africa by China...
About Us China Railway Hi-Tech Industry Co., Ltd. belongs to the world's 500 strong enterprises China Railway Group Limited
Contact us
Address:Building 11, Noble center, South Fourth Ring Road, Fengtai District, Beijing,China
E-mail:inter-biz@crhic.cn
Tel:010-52265888
Fax:010-52265888
Copyright © China Railway Hi-Tech Industry Corporation Limited . All Rights Reserved
犀牛云提供企业云服务