A-share600528
SKAB:SEK 161.1 -1.2%

News

News

Polish President Boarding China Railway-made Shield Machine: "This tunnel is of epoch-making signifi

Time: 2021-09-21
Times of browsing: 1

On September 21, the 'China Railway No. 797', a super large diameter (13.46m) mud-water balance shield machine which was independently developed by CRHIC subsidiary company China Railway Equipment, broke out the hole, marking the successful completion of the boring task of road tunnel project under the Świna River in Poland, during which an excellent work of daily progress of 18 meters and monthly progress of 338 meters were delivered. 

Polish President Boarding China Railway-made Shield Machine:

The project attracted widespread attention from Polish society and on the occasion of the tunnel opening, H.E. Mr. Andrzej Duda, the President of the Republic of Poland, visited the site and boarded the shield machine to witness the final ring of tubes being bored and assembled. He said, 'The completion of this tunnel is epoch-making significance (for Poland).' Mr. Janusz Żmurkiewicz, Mayor of Świętokrzyskie, and Ms. Barbara Michalska, the Deputy Mayor were at the receiving wellhead in person to watch the moment the shield machine broke out and praised the boring safety and efficiency of the shield machine.

Polish President Boarding China Railway-made Shield Machine:

The tunnel is located in north-western Poland between the islands of Uznam and Wolin in the city of Świno Uišice with 1,483 metre in length which is the longest underwater road tunnel in the Republic of Poland. The completion of the tunnel will rewrite the history of local commuting by ferry for hundred years, the commuting time across the river will be reduced from 40 minutes to 4 minutes, bringing great convenience to the local residents and greatly contributing to the economic development of both sides of the Świna River.


Related news / 推荐新闻 More
2024 - 10 - 02
On October 1st, the highly anticipated Macao Bridge (formerly known as the Fourth Bridge Linking Macau and Taipa) inauguration ceremony was grandly held on the banks of the Haojiang River, marking the completion and operation of the fourth cross-sea bridge connecting Macau and Taipa, built with the participation of CRHIC. Macao Bridge is the first two-way eight-lane cross-sea bridge in Macau.The M...
2024 - 08 - 06
On August 5th, five “explosion-proof” earth pressure balance TBMs for export projects in Italy passed client’s acceptance and collectively rolled off the production line at the manufacturing base of China Railway Engineering Equipment Group Co., Ltd. (CREG). The machines will be shipped to Italy for the PA-CT Phase II project on Island of Sicily and the Salerno high-speed railway project, providin...
2024 - 08 - 03
From completing the first section of the main line 23 days ahead of schedule, to entering the third phase of construction 45 days in advance, the East Coast Railway Link of Malaysia, a key project under “the belt and Road Initiative” has seen continuous acceleration thanks to the application of the CCPG500A intelligent multi-scene track-laying unit “Penglai” custom-made by China Railway Science an...
About Us China Railway Hi-Tech Industry Co., Ltd. belongs to the world's 500 strong enterprises China Railway Group Limited
Contact us
Address:Building 11, Noble center, South Fourth Ring Road, Fengtai District, Beijing,China
E-mail:inter-biz@crhic.cn
Tel:010-52265888
Fax:010-52265888
Copyright © China Railway Hi-Tech Industry Corporation Limited . All Rights Reserved
犀牛云提供企业云服务