A-share600528
SKAB:SEK 161.1 -1.2%

News

News

A Dragon-“Greater Bay Area”TBM in the Pearl River

Time: 2021-08-25
Times of browsing: 2

TBM 'Greater Bay Area' has a diameter of 13.32 meters and length of 133 meters. Its cutterhead is designed with the pattern of 'Dragon Going out to Sea'. The machine will be used for the construction of the Pearl River estuary tunnel of Shenzhen-Jiangmen Railway located between Guangzhou and Dongguan. The tunnel that spans 13.69km has been designed to have a maximum depth of 115m and maximum water pressure of 1.06 mPa, over 10 standard atmospheric pressure, making this underwater tunnel top China in this term. It is a one-tube two-lane high-speed railway tunnel with a designrf speed of 250 km/h.

A Dragon-“Greater Bay Area”TBM in the Pearl River

The tunnel underpasses the Pearl River through composite strata such as silt, sand layer and slightly weathered granite, as well as long-distance fault zone, with rock strength cup to 200 MPa. Given the construction difficulty and high safety risk caused by intricate geology and severe water corrosion in the surroundings, the tunnel is listed as the key engineering of Shenzhen-Jiangmen Railway Phase II project.

A Dragon-“Greater Bay Area”TBM in the Pearl River

According to the characteristics of the project, 'Greater Bay Area' is equipped with innovative technologies such as small spacing atmospheric pressure composite cutterhead, retractable main drive, ultra-high pressure automatic compensation, four-circuit pressure maintaining and air cushion straight tunneling system, which guarantee the subsequent safe and efficient construction.

A Dragon-“Greater Bay Area”TBM in the Pearl River

Related news / 推荐新闻 More
2024 - 12 - 04
Recently, at the award-presenting ceremony of ITA (International Tunnelling and Underground Space Association) “Product/Equipment Innovation of the Year” held in Genoa, Italy, the “Ultra-Small Turning Radius Hard Rock TBM” independently developed by China Railway Engineering Equipment Group Co., Ltd. successfully stood out from 21 global finalists after multiple rounds of competition, winning the ...
2024 - 11 - 29
“Ying Long”, the first kiloton multi-mode new energy bridge erecting machine in the world which is developed by China Railway Science and Industry Group Co., Ltd., successfully completed its “first show” at the JJZQ-8 bid of Jiangji Section of Zhuhai-Zhaoqing High-speed Railway on November 28.The Zhuhai-Zhaoqing High-speed Railway is generally applied with continuous ultra-low portal piers. Due to...
2024 - 11 - 06
On November 4, the first EPB TBM for export manufactured by China Railway Engineering Equipment Group Co., Ltd. (CREG) under CRHIC, successfully completed the right-line tunnel excavation of the Halkali-Ispartakule High-speed Railway project, marking a phased progress in the project construction.The project encompasses two excavation intervals: the left and right tunnelling intervals. Two sets of ...
2024 - 10 - 02
On October 1st, the highly anticipated Macao Bridge (formerly known as the Fourth Bridge Linking Macau and Taipa) inauguration ceremony was grandly held on the banks of the Haojiang River, marking the completion and operation of the fourth cross-sea bridge connecting Macau and Taipa, built with the participation of CRHIC. Macao Bridge is the first two-way eight-lane cross-sea bridge in Macau.The M...
Copyright © China Railway Hi-Tech Industry Corporation Limited . All Rights Reserved
犀牛云提供企业云服务