A-share600528
SKAB:SEK 161.1 -1.2%

News

News

The World's First Full Face Rock Shaft Boring Machine Successfully Completed

Time: 2021-12-28
Times of browsing: 6

The World's First Full Face Rock Shaft Boring Machine Successfully Completed

On December 28, the world's first full face rock shaft boring machine 'China Railway No. 599', which is independently developed by CREG, a CRHIC subsidiary company, broke through the hole from the underground plant exhaust shaft, as of the moment, the exhaust shaft of Ninghai Pumped Storage Power Station was successfully completed. The successful use of the full face rock shaft boring machine marked that China's tunnel boring machine enterprises, represented by CREG, successfully solved the world-class technical problems of full face rock shaft boring machine, realizing unmanned underground boring for the first time and made a breakthrough in the field of shaft boring machine.

The World's First Full Face Rock Shaft Boring Machine Successfully Completed

The diameter of 'China Railway No. 599' full face rock shaft boring machine is 7.83m, and the depth of the project is 200m, with good rock integrity and high rock strength. The equipment integrates traditional shaft construction technology and the concept of full face tunnel boring machine construction, which can safely and efficiently build a shaft and realize power sinking and unmanned underground construction for the first time. The equipment has the special propulsion technology with independent intellectual property rights, the mechanical synchronous slag discharge system with full face boring with independent intellectual property rights and the first remote control system for vertical shafts, so that the operator does not need to go down the shaft. It is the first time to realize three high-end technologies that allows unmanned construction of full face rock boring under the shaft.

The World's First Full Face Rock Shaft Boring Machine Successfully Completed

Related news / 推荐新闻 More
2024 - 12 - 04
Recently, at the award-presenting ceremony of ITA (International Tunnelling and Underground Space Association) “Product/Equipment Innovation of the Year” held in Genoa, Italy, the “Ultra-Small Turning Radius Hard Rock TBM” independently developed by China Railway Engineering Equipment Group Co., Ltd. successfully stood out from 21 global finalists after multiple rounds of competition, winning the ...
2024 - 11 - 29
“Ying Long”, the first kiloton multi-mode new energy bridge erecting machine in the world which is developed by China Railway Science and Industry Group Co., Ltd., successfully completed its “first show” at the JJZQ-8 bid of Jiangji Section of Zhuhai-Zhaoqing High-speed Railway on November 28.The Zhuhai-Zhaoqing High-speed Railway is generally applied with continuous ultra-low portal piers. Due to...
2024 - 11 - 06
On November 4, the first EPB TBM for export manufactured by China Railway Engineering Equipment Group Co., Ltd. (CREG) under CRHIC, successfully completed the right-line tunnel excavation of the Halkali-Ispartakule High-speed Railway project, marking a phased progress in the project construction.The project encompasses two excavation intervals: the left and right tunnelling intervals. Two sets of ...
2024 - 10 - 02
On October 1st, the highly anticipated Macao Bridge (formerly known as the Fourth Bridge Linking Macau and Taipa) inauguration ceremony was grandly held on the banks of the Haojiang River, marking the completion and operation of the fourth cross-sea bridge connecting Macau and Taipa, built with the participation of CRHIC. Macao Bridge is the first two-way eight-lane cross-sea bridge in Macau.The M...
Copyright © China Railway Hi-Tech Industry Corporation Limited . All Rights Reserved
犀牛云提供企业云服务