A-share600528
SKAB:SEK 161.1 -1.2%

News

News

The Shield Interval of Paris Metro Line 16 Lot 2 Project Completes

Time: 2023-04-28
Times of browsing: 57

On April 28, 2023 local time in France, as the cutter head of “China Railway No. 778” TBM manufactured by China Railway Engineering Equipment Group Co., Ltd. (CREG) under CRHIC breaks through the wall, the OA603P-OA501P Section of the Paris Metro Line 16 Lot 2 Project is successfully completed.


The shield tunnel of the Paris Metro Line 16 Lot 2 Project has a total length of 11.1 kilometers (5.8+5.3 kilometers) and a burial depth of 8-52 meters. The main under-crossing strata include granular gypsum horizon, silty clay, gypsum plaster horizon, limestone horizon and sand horizon. Based on the geological conditions of the Project, CREG has customized two earth pressure balance tunnel boring machines, namely, “China Railway No. 777” and “China Railway No. 778”. The two machines, with a diameter of 9.86 meters and the highest monthly tunneling footage of 419m and 384m respectively, are highly praised by customers.


The Shield Interval of Paris Metro Line 16 Lot 2 Project Completes


Related news / 推荐新闻 More
2026 - 05 - 27
Fasteners Underpin Mega Projects – China's First Intelligent Production Line for Large-Diameter High-Strength FastenersRecently, the 2026 Shanghai International Fastener Industry Expo grandly opened at the Shanghai World Expo Exhibition & Convention Center, drawing more than 1,300 enterprises covering the entire upstream and downstream industrial chain of fasteners from home and abroad to ...
2026 - 05 - 14
Thousand-degree heat conquered! Steel rail unveils its digital twinThe turnouts, known as the‘steering wheel' of a train bear the safety of thousands of passengers. Even a crack thinner than a hair inside could lead to an accident under the repeated rolling of trains day after day.At the turnout production base of CRBBG Nanjing Company, the painting line has increased the efficiency of rail sp...
2026 - 05 - 02
Bound for Dubai: Three TBMs sail overseas with product ecosystem to boost new infrastructureOn the afternoon of April 30, 2026, the day before International Workers' Day, three earth pressure balance shield machines developed by by China Railway Engineering Equipment Group Co., Ltd. (CREG), a core subsidiary of CRHIC,were launched in batches for the Dubai Metro Project. This marks the official...
2026 - 03 - 30
World's largest-diameter high-speed rail shield machine "Navigator" successfully breaks out of tunnelRecently, construction is in full swing on the Chongtai Yangtze River Tunnel, a landmark component of the Yangtze River High-Speed Railway, a key national project under the 15th Five-Year Plan. Buried 89 meters beneath the Yangtze River bed, the Navigator, the world's largest-diam...
Copyright © China Railway Hi-Tech Industry Corporation Limited . All Rights Reserved
犀牛云提供企业云服务