A-share600528
SKAB:SEK 161.1 -1.2%

News

News

A Dragon-“Greater Bay Area”TBM in the Pearl River

Time: 2021-08-25
Times of browsing: 2

TBM 'Greater Bay Area' has a diameter of 13.32 meters and length of 133 meters. Its cutterhead is designed with the pattern of 'Dragon Going out to Sea'. The machine will be used for the construction of the Pearl River estuary tunnel of Shenzhen-Jiangmen Railway located between Guangzhou and Dongguan. The tunnel that spans 13.69km has been designed to have a maximum depth of 115m and maximum water pressure of 1.06 mPa, over 10 standard atmospheric pressure, making this underwater tunnel top China in this term. It is a one-tube two-lane high-speed railway tunnel with a designrf speed of 250 km/h.

A Dragon-“Greater Bay Area”TBM in the Pearl River

The tunnel underpasses the Pearl River through composite strata such as silt, sand layer and slightly weathered granite, as well as long-distance fault zone, with rock strength cup to 200 MPa. Given the construction difficulty and high safety risk caused by intricate geology and severe water corrosion in the surroundings, the tunnel is listed as the key engineering of Shenzhen-Jiangmen Railway Phase II project.

A Dragon-“Greater Bay Area”TBM in the Pearl River

According to the characteristics of the project, 'Greater Bay Area' is equipped with innovative technologies such as small spacing atmospheric pressure composite cutterhead, retractable main drive, ultra-high pressure automatic compensation, four-circuit pressure maintaining and air cushion straight tunneling system, which guarantee the subsequent safe and efficient construction.

A Dragon-“Greater Bay Area”TBM in the Pearl River

Related news / 推荐新闻 More
2024 - 10 - 02
On October 1st, the highly anticipated Macao Bridge (formerly known as the Fourth Bridge Linking Macau and Taipa) inauguration ceremony was grandly held on the banks of the Haojiang River, marking the completion and operation of the fourth cross-sea bridge connecting Macau and Taipa, built with the participation of CRHIC. Macao Bridge is the first two-way eight-lane cross-sea bridge in Macau.The M...
2024 - 10 - 02
On October 1st, the highly anticipated Macao Bridge (formerly known as the Fourth Bridge Linking Macau and Taipa) inauguration ceremony was grandly held on the banks of the Haojiang River, marking the completion and operation of the fourth cross-sea bridge connecting Macau and Taipa, built with the participation of CRHIC. Macao Bridge is the first two-way eight-lane cross-sea bridge in Macau.The M...
2024 - 08 - 06
On August 5th, five “explosion-proof” earth pressure balance TBMs for export projects in Italy passed client’s acceptance and collectively rolled off the production line at the manufacturing base of China Railway Engineering Equipment Group Co., Ltd. (CREG). The machines will be shipped to Italy for the PA-CT Phase II project on Island of Sicily and the Salerno high-speed railway project, providin...
2024 - 08 - 06
On August 5th, five “explosion-proof” earth pressure balance TBMs for export projects in Italy passed client’s acceptance and collectively rolled off the production line at the manufacturing base of China Railway Engineering Equipment Group Co., Ltd. (CREG). The machines will be shipped to Italy for the PA-CT Phase II project on Island of Sicily and the Salerno high-speed railway project, providin...
About Us China Railway Hi-Tech Industry Co., Ltd. belongs to the world's 500 strong enterprises China Railway Group Limited
Contact us
Address:Building 11, Noble center, South Fourth Ring Road, Fengtai District, Beijing,China
E-mail:inter-biz@crhic.cn
Tel:010-52265888
Fax:010-52265888
Copyright © China Railway Hi-Tech Industry Corporation Limited . All Rights Reserved
犀牛云提供企业云服务