A-share600528
SKAB:SEK 161.1 -1.2%

News

News

"Tunnel Mechanization Special Equipment 4S" on the Plateau Officially Opened for Business

Time: 2021-09-01
Times of browsing: 4

On September 1st, tunnel mechanization special equipment 4S plateau station is officially completed and opened for the plateau railway construction. The CREG special equipment service station is located in Bomi County, Linzhi, Tibet, close to National Highway 318, with convenient transportation. It is set up with office area, parts inventory area, finished products display area, maintenance service area, etc., can provide product storage, parts sales, after-sales service, equipment overhaul and information services as one of the 'housekeeping' service, its service radius covers all the construction sites of the first and second phase of the Plateau Railway (Baju Linzhi section) project to ensure the smooth construction of the Plateau Railway tunnel project.


The service station is equipped with an accessory parts warehouse, which stores not only all kinds of consumable parts for special equipment such as three-arm rock drills, wet sprayers and anchor dollies, but also rock drills, cylinders, pump stations, hydraulic parts, pipe fittings and all kinds of controllers, relay components and common hydraulic oils, etc. The accessory parts are adequately stocked and managed by the ERP system, which is dynamically replenished to meet the needs of all work sites in the section from Baju to Linzhi.

The service station is equipped with maintenance containers with maintenance and service capabilities for rock drills, air compressors, hydraulic pipelines, electrical systems, etc. The service station is also selected with a number of excellent resident service engineers and special after-sales service vehicles to ensure 24-hour service 365 days a year. During the trial operation, where there is a customer service demands, the service engineers will respond within 1 hour and arrive at the site within 3 hours, troubleshoot within 12 hours to ensure smooth operation of the equipment. Service satisfaction rate reaches over 96%.


Related news / 推荐新闻 More
2024 - 12 - 04
Recently, at the award-presenting ceremony of ITA (International Tunnelling and Underground Space Association) “Product/Equipment Innovation of the Year” held in Genoa, Italy, the “Ultra-Small Turning Radius Hard Rock TBM” independently developed by China Railway Engineering Equipment Group Co., Ltd. successfully stood out from 21 global finalists after multiple rounds of competition, winning the ...
2024 - 11 - 29
“Ying Long”, the first kiloton multi-mode new energy bridge erecting machine in the world which is developed by China Railway Science and Industry Group Co., Ltd., successfully completed its “first show” at the JJZQ-8 bid of Jiangji Section of Zhuhai-Zhaoqing High-speed Railway on November 28.The Zhuhai-Zhaoqing High-speed Railway is generally applied with continuous ultra-low portal piers. Due to...
2024 - 11 - 06
On November 4, the first EPB TBM for export manufactured by China Railway Engineering Equipment Group Co., Ltd. (CREG) under CRHIC, successfully completed the right-line tunnel excavation of the Halkali-Ispartakule High-speed Railway project, marking a phased progress in the project construction.The project encompasses two excavation intervals: the left and right tunnelling intervals. Two sets of ...
2024 - 10 - 02
On October 1st, the highly anticipated Macao Bridge (formerly known as the Fourth Bridge Linking Macau and Taipa) inauguration ceremony was grandly held on the banks of the Haojiang River, marking the completion and operation of the fourth cross-sea bridge connecting Macau and Taipa, built with the participation of CRHIC. Macao Bridge is the first two-way eight-lane cross-sea bridge in Macau.The M...
Copyright © China Railway Hi-Tech Industry Corporation Limited . All Rights Reserved
犀牛云提供企业云服务